Search results
- [[Category:Measures]][[Category:08. Floodplains/off-channel/lateral connectivity habitats impro855 B (89 words) - 15:42, 24 June 2015
- [[Category:Measures]][[Category:08. Floodplains/off-channel/lateral connectivity habitats impro7 KB (990 words) - 15:44, 24 June 2015
- Different measures targeted at floodplains can result in runoff control and appropriate land m ...Floodplain restoration measures should always be accompanied by management measures at the catchment scale.6 KB (826 words) - 22:11, 8 December 2015
- This restoration type comprises habitat enhancement measures such as the reconnecting or the creating of lentic backwaters or small back ...Contract No. 070311/2011/603663/ETU/DI ‘Comparative Study of Pressures & Measures in the Major River Basin Management Plans’ (Task 3b). Ecologic Institute,4 KB (581 words) - 22:20, 8 December 2015
- [[Category:Measures]][[Category:08. Floodplains/off-channel/lateral connectivity habitats impro3 KB (384 words) - 12:37, 7 January 2019
- =Other measures= [[Category:Measures]][[Category:09. Other aims to improve hydrological or morphological conditi794 B (87 words) - 15:29, 24 June 2015
- ==Measures selection== National natural and ecology policy led to measures being taken to restore part of the natural flow and dynamics in the channel10 KB (1,199 words) - 16:38, 24 June 2011
- ==Measures selection== == Related Measures ==11 KB (1,576 words) - 10:28, 13 July 2010
- ==Measures selection== == Related Measures ==8 KB (1,246 words) - 14:10, 28 June 2010
- ==Measures selection== == Related Measures ==9 KB (1,313 words) - 11:22, 28 June 2010
- ==Measures selection== This action includes forestry and agri-environment measures, including restoration of the stream margins and actions in the alluvial fa6 KB (888 words) - 17:57, 1 September 2010
- ...floodplain, an aspect which is often neglected, even in the Programmes of Measures of the WFD. ==Measures selection==5 KB (667 words) - 15:34, 27 May 2014
- ==Measures selection== == Related Measures ==833 B (77 words) - 18:55, 7 April 2010
- ==Measures selection== Measures at the site Lahn – Cölbe were applied on a river section of 240 m from S7 KB (910 words) - 16:52, 9 June 2015
- ==Measures selection== == Related Measures ==2 KB (225 words) - 12:48, 19 April 2010
- ==Measures selection== == Related Measures ==942 B (83 words) - 10:40, 12 April 2010
- ==Measures selection== There are two groups of measures: Morphological and about riparian vegetation.4 KB (575 words) - 10:56, 24 May 2010
- ==Measures selection== == Related Measures ==848 B (74 words) - 15:27, 28 July 2011
- ==Measures selection== == Related Measures ==874 B (79 words) - 18:53, 7 April 2010
- ==Measures selection== == Related Measures ==2 KB (260 words) - 11:02, 8 April 2010
- ==Measures selection== == Related Measures ==2 KB (210 words) - 16:16, 8 April 2010
- ==Measures selection== == Related Measures ==1 KB (171 words) - 18:09, 8 April 2010
- ==Measures selection== ...eech and oak forests, and the reintroduction of the Pyrenean Chamois.These measures benefit the ecosystems but also the local populations. <br /><br />6 KB (842 words) - 15:27, 8 June 2010
- ==Measures selection== ...ilability of habitats and recovery the fish populations. So, the principal measures are directed to improve the quality of the water, improve the structure and12 KB (1,799 words) - 15:35, 8 June 2010
- ==Measures selection== ...first stage of the total project which envolves mitigation and preventive measures<ref>Factsheet of the project for improve the ecological state of the Pisuer5 KB (691 words) - 15:49, 8 June 2010
- core area of measures 8900 ha along a 90 km river stretch, total area of planning unit 18 700 ha ==Measures selection==1 KB (146 words) - 14:16, 9 April 2010
- ==Measures selection== Some of the measures can improve the structure and composition of the riparian vegetation: silvi4 KB (552 words) - 15:58, 8 June 2010
- ==Measures selection== == Related Measures ==4 KB (523 words) - 19:19, 20 May 2010
- ==Measures selection== The main measures include:5 KB (740 words) - 18:08, 20 May 2010
- ==Measures selection== == Related Measures ==4 KB (494 words) - 21:57, 20 May 2010
- ==Measures selection== == Related Measures ==2 KB (191 words) - 19:24, 9 April 2010
- ==Measures selection== :*Since the reach has a great ecological potential, certain measures are aimed to promote the establishment of communities related to aquatic en7 KB (1,001 words) - 19:32, 17 May 2010
- ==Measures selection== ...nding, for check the good preformance and the effectiveness of the planned measures.9 KB (1,377 words) - 14:05, 7 January 2019
- ==Measures selection== == Related Measures ==2 KB (176 words) - 14:05, 24 November 2010
- ==Measures selection== == Related Measures ==2 KB (205 words) - 14:06, 24 November 2010
- ==Measures selection== == Related Measures ==2 KB (232 words) - 16:57, 26 April 2010
- ==Measures selection== To restore the Skerne in Darlington, several measures were taken. First, the channel was made more natural with meanders when the11 KB (1,656 words) - 13:52, 30 July 2013
- ==Measures selection== == Related Measures ==10 KB (1,428 words) - 16:06, 28 June 2010
- ==Measures selection== Some of the measures can improve the structure and composition of the riparian vegetation: silvi4 KB (552 words) - 12:14, 8 June 2010
- ==Measures selection== == Related Measures ==7 KB (992 words) - 11:53, 29 June 2010
- ...groynes. Part of the natural meanders were removed through channelization measures. ==Measures selection==11 KB (1,341 words) - 10:14, 13 July 2010
- ==Measures selection== == Related Measures ==2 KB (101 words) - 10:54, 1 June 2010
- ==Measures selection== == Related Measures ==5 KB (108 words) - 11:13, 1 June 2010
- ==Measures selection== == Related Measures ==4 KB (108 words) - 11:12, 1 June 2010
- ==Measures selection== == Related Measures ==3 KB (109 words) - 11:13, 1 June 2010
- ==Measures selection== == Related Measures ==2 KB (122 words) - 12:08, 1 June 2010
- ==Measures selection== == Related Measures ==1 KB (111 words) - 12:08, 1 June 2010
- ==Measures selection== == Related Measures ==2 KB (105 words) - 12:05, 1 June 2010
- ==Measures selection== == Related Measures ==2 KB (110 words) - 12:04, 1 June 2010
- ==Measures selection== == Related Measures ==2 KB (111 words) - 12:06, 1 June 2010