Search results

Jump to: navigation, search
  • File:Kerkum 2009b.pdf
    ...e projects to be carried out and past results found at all the sides where measures were applied during this project. Text is in dutch.
    (2.07 MB) - 08:50, 6 April 2010
  • File:Plano Partido.jpg
    Map of the main measures
    (508 × 387 (38 KB)) - 14:42, 6 April 2010
  • File:Skerne map.JPG
    Map of measures Skerne
    (603 × 377 (38 KB)) - 13:50, 30 July 2013
  • File:Rosenheim before after.JPG
    Rosenheim before and after the construction of the measures. Modified from Life vein – Upper Drau River (2011)
    (639 × 525 (74 KB)) - 21:59, 6 August 2013
  • File:Obergottesfeld before after.JPG
    Obergottesfeld before and after the construction of the measures. Taken from Life vein – Upper Drau River (2011)
    (739 × 505 (71 KB)) - 22:22, 6 August 2013
  • File:Amlach before after.JPG
    Amlach/St. Peter before and after construction of the measures. Taken from Life vein – Upper Drau River (2011)
    (818 × 512 (84 KB)) - 22:49, 6 August 2013
  • File:Map bislich.JPG
    Map of planned measures in Bislich-Vahnum. Taken from NABU-Naturschutzstation e.V., Nebenstromrinne
    (283 × 616 (27 KB)) - 09:24, 7 August 2013
  • File:D picture1.png
    Figure 1: Overview restoration measures Kleblach (cp. MANDLER, H., PETUTSCHNIG, W. & SEREINIG, N., 2004)
    (396 × 540 (593 KB)) - 13:15, 12 February 2014
  • File:E picture1.jpg
    Figure 1: Overview restoration measures Aich (cp. IHG, 2007)
    (335 × 500 (71 KB)) - 14:38, 12 February 2014

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)