To reintroduce natural dynamics and create a more natural river the old meander of Uilenkamp was reconnected to the river Vecht. Bank fixation was removed along the (former) main channel and used to construct a dam that blocks of the main channel during normal flow conditions. This forces the main flow through the reconnected meander and allows for natural processes such as erosion to take place. During peak flows and high water conditions the dam is flooded and water can also flow through the former channel. This measure has led to an increase in river length of 1 km, which leads to increased water retention in dry periods. Also, the water storage capacity of the area was increase. Part of this was done by lowering a nearby floodplain (formerly agricultural land) and digging a number of pools in the area.
  
 
==Success criteria==
 
==Success criteria==

Revision as of 10:46, 21 June 2010

Uilenkamp - Meander reconnection


Factsheet: Uilenkamp - Meander reconnection

General
Country NL
River Name Overijsselse Vecht
Site Name Uilenkamp - Meander reconnection
River Characterisation
    River typology
    Location (Lat Lon) 52.5282323822381, 6.56360149383545
    Altitude lowland: < 200 m
    Catchment area large: > 1000 - 10000 km2
    Geology Siliceous
    National code/
    River type name
    R7
    Hydromorphological quality elements

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size 24 ha
    Approximate costs
    Synergy Flood protection
    Status
    Period of realization 2004-2006
    Evaluation Ecological change
    Implemented by Waterschap Velt & Vecht


    Key features of the case study

    Site description

    The Vecht river has served as a shipping route in the past. Nowadays it is no longer used for this commercial function. This has made it possible to go from a deep, straightened river to a more natural situation. A first step in this direction was taken by the local water authority with funding of the EU Interreg project. The site of Uilenkamp is a meander that was cut off at the start of the last century to make the Vecht river more suitable for navigation. The banks of the river were fixated and the channel straightened and deepened. This has led to an unnatural channel with relatively few chances for biota to flourish due to the lack of habitat diversity.

    Measures selection

    To reintroduce natural dynamics and create a more natural river the old meander of Uilenkamp was reconnected to the river Vecht. Bank fixation was removed along the (former) main channel and used to construct a dam that blocks of the main channel during normal flow conditions. This forces the main flow through the reconnected meander and allows for natural processes such as erosion to take place. During peak flows and high water conditions the dam is flooded and water can also flow through the former channel. This measure has led to an increase in river length of 1 km, which leads to increased water retention in dry periods. Also, the water storage capacity of the area was increase. Part of this was done by lowering a nearby floodplain (formerly agricultural land) and digging a number of pools in the area.

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information