Difference between revisions of "Altarm Monchwinkel"
From REFORM wiki
(New page: =Altarm Monchwinkel= <googlemap version="0.9" lat="52.3768" lon="13.8796" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large"> (A) 52.3768, 13.8796</g...) |
(→Key features of the case study) |
||
Line 7: | Line 7: | ||
==Key features of the case study== | ==Key features of the case study== | ||
− | + | [[Media:test.pdf]] | |
==Site description== | ==Site description== |
Latest revision as of 17:55, 7 April 2010
Altarm Monchwinkel
Key features of the case study
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- No measures have been assigned to this project.
Related Pressures
- No related pressures were found.