Difference between revisions of "Weissenthurm"

From REFORM wiki
Jump to: navigation, search
Line 1: Line 1:
 
=Weissenthurm=
 
=Weissenthurm=
  
<googlemap version="0.9" lat="50.422" lon="7.503" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">
+
<googlemap version="0.9" lat="50.427317168403" lon="7.44491100311279" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">
(A) 50.422, 7.503</googlemap>  
+
(A) 50.427317168403, 7.44491100311279</googlemap>  
  
<Forecasterlink type="getProjectInfoBox" code="67" />
+
<Forecasterlink type="getProjectInfoBox" code="71" />
 
    
 
    
 
==Key features of the case study==
 
==Key features of the case study==
Line 35: Line 35:
 
== Related Measures ==
 
== Related Measures ==
  
<Forecasterlink type="getMeasuresForProject" code="67" />
+
<Forecasterlink type="getMeasuresForProject" code="71" />
  
 
== Related Pressures ==
 
== Related Pressures ==
  
<Forecasterlink type="getPressuresForProject" code="67" />
+
<Forecasterlink type="getPressuresForProject" code="71" />
 +
 
 +
[[Category:River depth and width variation]] [[Category:Structure of the floodplain]]

Revision as of 08:24, 8 April 2010

Weissenthurm


Factsheet: Weissenthurm

General
Country DE
River Name Nette
Site Name Weissenthurm
River Characterisation
    River typology
    Location (Lat Lon) 50.427317168403, 7.44491100311279
    Altitude lowland: < 200 m
    Catchment area medium: > 100 - 1000 km2
    Geology Siliceous
    National code/
    River type name
    Type 9
    Hydromorphological quality elements

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size 1 km
    Approximate costs 100 000 - 1 000 000 Euros
    Synergy
    Status Realised
    Period of realization 08-10/2007
    Evaluation None


    Key features of the case study

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

    Related Pressures