Difference between revisions of "Thur"
From REFORM wiki
Line 1: | Line 1: | ||
=Thur= | =Thur= | ||
− | <googlemap version="0.9" lat="47. | + | <googlemap version="0.9" lat="47.592" lon="8.76514" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large"> |
− | (A) 47. | + | (A) 47.592, 8.76514 |
+ | </googlemap> | ||
+ | |||
+ | <Forecasterlink type="getProjectInfoBox" code="262" /> | ||
− | |||
− | |||
==Key features of the case study== | ==Key features of the case study== | ||
− | |||
==Site description== | ==Site description== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
==Measures selection== | ==Measures selection== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
==Success criteria== | ==Success criteria== | ||
− | |||
− | |||
==Ecological response== | ==Ecological response== | ||
− | |||
==Hydromorphological response== | ==Hydromorphological response== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
==Monitoring before and after implementation of the project== | ==Monitoring before and after implementation of the project== | ||
Line 44: | Line 26: | ||
==Extra background information== | ==Extra background information== | ||
− | |||
==References== | ==References== | ||
+ | |||
<references/> | <references/> | ||
Line 53: | Line 35: | ||
== Related Measures == | == Related Measures == | ||
− | <Forecasterlink type="getMeasuresForProject" code=" | + | <Forecasterlink type="getMeasuresForProject" code="262" /> |
== Related Pressures == | == Related Pressures == | ||
− | <Forecasterlink type="getPressuresForProject" code=" | + | <Forecasterlink type="getPressuresForProject" code="262" /> |
− | [[Category:River depth and width variation]] [[Category:Structure and substrate of the river bed]] [[Category:Structure of the riparian zone]] [[Category:Fish]] | + | [[Category:Quantity and dynamics of water flow]] [[Category:Connection to groundwater bodies]] [[Category:River continuity]] [[Category:River depth and width variation]] [[Category:Structure and substrate of the river bed]] [[Category:Structure of the riparian zone]] [[Category:Structure of the floodplain]] [[Category:Phytoplankton]] [[Category:Macrophytes and phytobenthos]] [[Category:Benthic invertebrates]] [[Category:Fish]] |
Revision as of 08:51, 27 May 2014
Thur
Key features of the case study
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Reduce anthropogenic flow peaks
- Shorten the length of impounded reaches
- Link flood reduction with ecological restoration
- Establish environmental flows / naturalise flow regimes
- Widen water courses
- Allow/increase lateral channel migration or river mobility
- Remeander water courses
- Shallow water courses
- Initiate natural channel dynamics to promote natural regeneration
- Remove sediments
- Remove bank fixation
- Remove or modify in-channel hydraulic structures
- Recreate gravel bar and riffles
- Develop riparian forest
- Adjust land use to develop riparian vegetation
- Revegetate riparian zones
- Remove bank fixation
- Lower river banks or floodplains to enlarge inundation and flooding
- Remove hard engineering structures that impede lateral connectivity
- Set back embankments, levees or dikes
- Retain floodwater