Difference between revisions of "Set back embankments, levees or dikes"
From REFORM wiki
(→Set back embankments, levees or dikes) |
|||
Line 1: | Line 1: | ||
=Set back embankments, levees or dikes= | =Set back embankments, levees or dikes= | ||
+ | Category 08. Floodplains/off-channel/lateral connectivity habitats improvement | ||
− | |||
==General description == | ==General description == | ||
Revision as of 14:45, 24 June 2015
Contents
- 1 Set back embankments, levees or dikes
- 1.1 General description
- 1.2 Applicability
- 1.3 Expected effect of measure on (including literature citations):
- 1.4 Temporal and spatial response
- 1.5 Pressures that can be addressed by this measure
- 1.6 Cost-efficiency
- 1.7 Case studies where this measure has been applied
- 1.8 Useful references
- 1.9 Other relevant information
Set back embankments, levees or dikes
Category 08. Floodplains/off-channel/lateral connectivity habitats improvement
General description
Applicability
Expected effect of measure on (including literature citations):
- HYMO (general and specified per HYMO element)
- physico � chemical parameters
- Biota (general and specified per Biological quality elements)
Temporal and spatial response
Pressures that can be addressed by this measure
Cost-efficiency
Case studies where this measure has been applied
- Renaturierung Untere Havel
- Regge Velderberg
- Rijkelse Bemden - River bed widening
- Thur
- Bouxweerd - Artificial pool
- Low reach of River Cinca
- Töss
- Pastures Bridge Rehabilitation
- River Roding at Ray Lodge Park
- River Skerne EU-LIFE project
- Sella
- Haselünne
- Bakenhof - Dyke relocation
- Polder Ingelheim – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)
- Hondsbroeksche Pleij – Restoring former floodplains (INTERREG Sustainable Development of Floodplains)
- Meuse - Overdiepse Polder
- Lower Traun
- Ruhr Binnerfeld