Difference between revisions of "Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/00023)"

From REFORM wiki
Jump to: navigation, search
(New page: =Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/00023)= <googlemap version="0.9" lat="59.5955357587933" lon="12.568359375" zoom="13" width="100%" height="400" scale="yes" overvie...)
 
(Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/00023))
Line 1: Line 1:
 
=Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/00023)=
 
=Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/00023)=
  
<googlemap version="0.9" lat="59.5955357587933" lon="12.568359375" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">
+
<googlemap version="0.9" lat="59.5955357587933" lon="12.568359375" zoom="9" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">
 
(A) 59.5955357587933, 12.568359375</googlemap>  
 
(A) 59.5955357587933, 12.568359375</googlemap>  
  

Revision as of 15:16, 30 June 2011

Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/00023)


Factsheet: Sweden- Restoration of the Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/000231)

General
Country SE
River Name 21 different water courses
Site Name Sweden- Restoration of the Freshwater Pearl Mussel and its habitats (LIFE04/NAT/SE/000231)
River Characterisation
    River typology
    Location (Lat Lon) 59.1421349497426, 12.1728515625
    Altitude lowland: < 200 m
    Catchment area small: 10 - 100 km2
    Geology
    National code/
    River type name
    Hydromorphological quality elements

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size -1
    Approximate costs > 1 000 000 Euros
    Synergy
    Status Realised
    Period of realization 2004-2009
    Evaluation Hydromorphological and ecological changes
    Implemented by WWF Sweden


    Key features of the case study

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

    Related Pressures