Difference between revisions of "Shorten the length of impounded reaches"
(New page: =Shorten the length of impounded reaches= Shorten the length of impounded reachesFlow dynamics improvement ==General description == ==Applicability == ==Expected effect of measure on (i...) |
(→Cost-efficiency) |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
− | |||
=Shorten the length of impounded reaches= | =Shorten the length of impounded reaches= | ||
+ | Category 03. Flow dynamics improvement | ||
− | |||
==General description == | ==General description == | ||
+ | An impouded reach generally develops upstream of a transverse barrier (e.g. weir, dams) with numerous effects for the system. For a list of effects following this pressure please compare: http://wiki.reformrivers.eu/index.php/Impoundment). For a general description of effects due to artificial barriers please compare: http://wiki.reformrivers.eu/index.php/Artificial_barriers_downstream_from_the_site). | ||
+ | The length of impounded reaches can be shortened by the removal of obstacles (e.g. dam removal). Therefore, we suggest to refer to the measure “Remove barrier” (http://wiki.reformrivers.eu/index.php/Remove_barrier). | ||
+ | |||
+ | Another positive effect is the establishment of longitudinal connectivity. | ||
==Applicability == | ==Applicability == | ||
+ | We suggest to refer to the measure “Remove barrier” (http://wiki.reformrivers.eu/index.php/Remove_barrier). | ||
+ | |||
==Expected effect of measure on (including literature citations): == | ==Expected effect of measure on (including literature citations): == | ||
− | + | We suggest to refer to the measure “Remove barrier” (http://wiki.reformrivers.eu/index.php/Remove_barrier). | |
− | + | ||
− | + | ||
==Temporal and spatial response == | ==Temporal and spatial response == | ||
+ | Not Available | ||
+ | |||
==Pressures that can be addressed by this measure == | ==Pressures that can be addressed by this measure == | ||
<Forecasterlink type="getPressuresForMeasures" code="M23" /> | <Forecasterlink type="getPressuresForMeasures" code="M23" /> | ||
==Cost-efficiency == | ==Cost-efficiency == | ||
+ | Not available. | ||
+ | |||
==Case studies where this measure has been applied == | ==Case studies where this measure has been applied == | ||
<Forecasterlink type="getProjectsForMeasures" code="M23" /> | <Forecasterlink type="getProjectsForMeasures" code="M23" /> | ||
==Useful references == | ==Useful references == | ||
==Other relevant information == | ==Other relevant information == | ||
+ | The National Park Service - Time Lapse of the removal of Elwha Dam, Washington State: https://www.youtube.com/watch?v=bUZE7kgXKJc | ||
− | [[Category:Measures]][[Category:Flow dynamics improvement]] | + | [[Category:Measures]][[Category:03. Flow dynamics improvement]] |
Latest revision as of 14:54, 4 December 2015
Contents
- 1 Shorten the length of impounded reaches
- 1.1 General description
- 1.2 Applicability
- 1.3 Expected effect of measure on (including literature citations):
- 1.4 Temporal and spatial response
- 1.5 Pressures that can be addressed by this measure
- 1.6 Cost-efficiency
- 1.7 Case studies where this measure has been applied
- 1.8 Useful references
- 1.9 Other relevant information
Shorten the length of impounded reaches
Category 03. Flow dynamics improvement
General description
An impouded reach generally develops upstream of a transverse barrier (e.g. weir, dams) with numerous effects for the system. For a list of effects following this pressure please compare: http://wiki.reformrivers.eu/index.php/Impoundment). For a general description of effects due to artificial barriers please compare: http://wiki.reformrivers.eu/index.php/Artificial_barriers_downstream_from_the_site). The length of impounded reaches can be shortened by the removal of obstacles (e.g. dam removal). Therefore, we suggest to refer to the measure “Remove barrier” (http://wiki.reformrivers.eu/index.php/Remove_barrier).
Another positive effect is the establishment of longitudinal connectivity.
Applicability
We suggest to refer to the measure “Remove barrier” (http://wiki.reformrivers.eu/index.php/Remove_barrier).
Expected effect of measure on (including literature citations):
We suggest to refer to the measure “Remove barrier” (http://wiki.reformrivers.eu/index.php/Remove_barrier).
Temporal and spatial response
Not Available
Pressures that can be addressed by this measure
Cost-efficiency
Not available.
Case studies where this measure has been applied
Useful references
Other relevant information
The National Park Service - Time Lapse of the removal of Elwha Dam, Washington State: https://www.youtube.com/watch?v=bUZE7kgXKJc