Difference between revisions of "Low reach of River Cinca"
(→Site description) |
(→Site description) |
||
Line 10: | Line 10: | ||
==Site description== | ==Site description== | ||
− | The river Cinca is one of the largest rivers in the Ebro Basin. | + | The river Cinca is one of the largest rivers in the Ebro Basin that drains part of the North of Aragon, in Spain. The river has a lot of impacts in both riverbanks: crops, urban areas, reforested areas, levees, communication infrastructures... |
+ | |||
+ | There is a huge presence of sediments inside the stream that usually formed bars, more or less colonized by natural vegetation. The flow regime is regulated by upstream dams like "Mediano" o "El Grado" (436hm<sup><small>3</small></sup> and 399hm<sup><small>3</small></sup>). | ||
+ | |||
+ | The presence of crops and cutivated areas has contributed to build defenses and to profit the fertile soils to plant black poplars. | ||
[[Image:Fraga_motas.jpg|center|frame|View of the leeve that only defends crops]] | [[Image:Fraga_motas.jpg|center|frame|View of the leeve that only defends crops]] |
Revision as of 14:53, 14 April 2010
Low reach of River Cinca
Key features of the case study
The objective of the project is to restore the stream morphology and floodplain conditions of the river Cinca in the lower reach, between Velilla de Cinca and Fraga. There are a major actuation that consist of remove a levee that only protect crops.
Site description
The river Cinca is one of the largest rivers in the Ebro Basin that drains part of the North of Aragon, in Spain. The river has a lot of impacts in both riverbanks: crops, urban areas, reforested areas, levees, communication infrastructures...
There is a huge presence of sediments inside the stream that usually formed bars, more or less colonized by natural vegetation. The flow regime is regulated by upstream dams like "Mediano" o "El Grado" (436hm3 and 399hm3).
The presence of crops and cutivated areas has contributed to build defenses and to profit the fertile soils to plant black poplars.
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
http://oph.chebro.es/DOCUMENTACION/Restauracion/Restauracion.htm
Related Measures
- Link flood reduction with ecological restoration
- Widen water courses
- Allow/increase lateral channel migration or river mobility
- Set back embankments, levees or dikes
- Develop riparian forest
- Remove hard engineering structures that impede lateral connectivity
- Revegetate riparian zones