Difference between revisions of "Remove hard engineering structures that impede lateral connectivity"

From REFORM wiki
Jump to: navigation, search
(New page: =Remove hard engineering structures that impede lateral connectivity= Remove hard engineering structures that impede lateral connectivityFloodplains/off-channel/lateral connectivity habi...)
(No difference)

Revision as of 18:04, 17 March 2010

Remove hard engineering structures that impede lateral connectivity

Remove hard engineering structures that impede lateral connectivityFloodplains/off-channel/lateral connectivity habitats improvement

General description

Applicability

Expected effect of measure on (including literature citations):

  • HYMO (general and specified per HYMO element)
  • physico � chemical parameters
  • Biota (general and specified per Biological quality elements)

Temporal and spatial response

Pressures that can be addressed by this measure

Cost-efficiency

Case studies where this measure has been applied

Useful references

Other relevant information