Difference between revisions of "Remove bank fixation"
From REFORM wiki
Line 1: | Line 1: | ||
=Remove bank fixation= | =Remove bank fixation= | ||
− | Remove bank | + | Remove bank fixation07. Riparian zone improvement |
==General description == | ==General description == | ||
Line 11: | Line 11: | ||
==Temporal and spatial response == | ==Temporal and spatial response == | ||
==Pressures that can be addressed by this measure == | ==Pressures that can be addressed by this measure == | ||
− | <Forecasterlink type="getPressuresForMeasures" code=" | + | <Forecasterlink type="getPressuresForMeasures" code="M53" /> |
==Cost-efficiency == | ==Cost-efficiency == | ||
==Case studies where this measure has been applied == | ==Case studies where this measure has been applied == | ||
− | <Forecasterlink type="getProjectsForMeasures" code=" | + | <Forecasterlink type="getProjectsForMeasures" code="M53" /> |
==Useful references == | ==Useful references == | ||
==Other relevant information == | ==Other relevant information == | ||
− | [[Category:Measures]][[Category: | + | [[Category:Measures]][[Category:07. Riparian zone improvement]] |
Revision as of 13:22, 18 March 2010
Contents
- 1 Remove bank fixation
- 1.1 General description
- 1.2 Applicability
- 1.3 Expected effect of measure on (including literature citations):
- 1.4 Temporal and spatial response
- 1.5 Pressures that can be addressed by this measure
- 1.6 Cost-efficiency
- 1.7 Case studies where this measure has been applied
- 1.8 Useful references
- 1.9 Other relevant information
Remove bank fixation
Remove bank fixation07. Riparian zone improvement
General description
Applicability
Expected effect of measure on (including literature citations):
- HYMO (general and specified per HYMO element)
- physico � chemical parameters
- Biota (general and specified per Biological quality elements)
Temporal and spatial response
Pressures that can be addressed by this measure
- Channelisation / cross section alteration
- Embankments, levees or dikes
- Alteration of instream habitat
Cost-efficiency
Case studies where this measure has been applied
- Asseltse Plassen - Bank erosion
- Lahn Cölbe
- Renaturierung Untere Havel
- Spree - Restoration and remeandering of the Müggelspree - downstream Mönchwinkel
- Lek bij Everdingen - Groyne shields
- Regge Velderberg
- Klebach - Side channel
- Thur
- Dommel Eindhoven
- Ems floodplain (LIFE project)
- Skjern - LIFE project
- River Quaggy, Chinbrook Meadows
- Vallacuera ravine. Removal of a dyke.
- Drava - Kleblach
- Bakenhof - Dyke relocation
- Enns - Aich
- Oberwerries - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)
- Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort” (LIFE05/NAT/D/000057)
- Lower Traun
- Lippeaue Klostermersch
- Ruhr Binnerfeld