Difference between revisions of "Brüggen"

From REFORM wiki
Jump to: navigation, search
(New page: =Brüggen= <googlemap version="0.9" lat="51.233333" lon="6.15" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large"> (A) 51.233333, 6.15</googlemap> ...)
 
 
Line 1: Line 1:
 
=Brüggen=
 
=Brüggen=
  
<googlemap version="0.9" lat="51.233333" lon="6.15" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">
+
<googlemap version="0.9" lat="51.2364998698299" lon="6.16373777389526" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large">
(A) 51.233333, 6.15</googlemap>  
+
(A) 51.2364998698299, 6.16373777389526</googlemap>  
  
<Forecasterlink type="getProjectInfoBox" code="68" />
+
<Forecasterlink type="getProjectInfoBox" code="168" />
 
    
 
    
 
==Key features of the case study==
 
==Key features of the case study==
Line 35: Line 35:
 
== Related Measures ==
 
== Related Measures ==
  
<Forecasterlink type="getMeasuresForProject" code="68" />
+
<Forecasterlink type="getMeasuresForProject" code="168" />
  
 
== Related Pressures ==
 
== Related Pressures ==
  
<Forecasterlink type="getPressuresForProject" code="68" />
+
<Forecasterlink type="getPressuresForProject" code="168" />
 +
 
 +
[[Category:Macrophytes and phytobenthos]] [[Category:Benthic invertebrates]] [[Category:Fish]]

Latest revision as of 09:40, 12 April 2010

Brüggen


Factsheet:

General
Country
River Name
Site Name
River Characterisation
    River typology
    Location (Lat Lon) ,
    Altitude
    Catchment area
    Geology
    National code/
    River type name

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size
    Approximate costs
    Synergy
    Status
    Period of realization
    Evaluation


    Key features of the case study

    Site description

    Measures selection

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Extra background information

    References


    Related Measures

      No measures have been assigned to this project.

    Related Pressures