Difference between revisions of "Odra. Actions for environmental restoration and flood control in the lower basin of the Odra River (Burgos)"

From REFORM wiki
Jump to: navigation, search
(Extra background information)
m (Contact person within the organization)
Line 32: Line 32:
  
 
==Contact person within the organization==
 
==Contact person within the organization==
 +
Ignacio Rodríguez Muñóz. <br />Comisario de Aguas de la Confederación Hidrográfica del Duero.<br />
 +
e-mail: irm@chduero.es<br />
  
 
==Extra background information==
 
==Extra background information==

Revision as of 16:28, 14 April 2010

Odra. Actions for environmental restoration and flood control in the lower basin of the Odra River (Burgos)


Factsheet: Odra. Actions for environmental restoration and flood control in the lower basin of the Odra River (Burgos)

General
Country ES
River Name Odra
Site Name Odra. Actions for environmental restoration and flood control in the lower basin of the Odra River (Burgos)
River Characterisation
    River typology
    Location (Lat Lon) 42.2811190141333, -4.16879653930664
    Altitude mid-altitude: 200 - 800 m
    Catchment area medium: > 100 - 1000 km2
    Geology
    National code/
    River type name
    4 Río mineralizado de la Meseta Norte

    Biological quality elements
    Ecosystem Services
    EU Directives
    Pressures
    Measures
    Other
    Project size 100 ha
    Approximate costs > 1 000 000 Euros
    Synergy Included in the protected area LIC ES4140082
    Status In progress
    Period of realization 2008
    Evaluation
    Implemented by Confederación Hidrológica del Duero. Ministry of Environment


    Key features of the case study

    Site description

    The agricultural development of the last decades has modified the Odra fluvial system so deeply, consequently the river planform has changed, also loosing part of its lateral functionality due to the construction of lateral levees, resulting in lower inundability of the floodplain and invasion of the public hydraulic domain in comparison with a reference state. The disapearance of the riparian corridor makes easier the flooding frequency, even though the high flows are not necessarily too high.

    Loss of lateral connectivity due to streambank elevation for flood protection. Previous to the restoration project
    Absence of riparian corridor

    Measures selection

    The project aimed to compensate the flood protection constructions by improving and creating the riparian vegetation.
    the measures include:

    • Removal of sediments and waste from the river channel
    • Silvicultural treatments (sowing and plantation of native species)
    • Morphological recovery at some channel reaches

    Success criteria

    Ecological response

    Hydromorphological response

    Monitoring before and after implementation of the project

    Socio-economic aspects

    Contact person within the organization

    Ignacio Rodríguez Muñóz.
    Comisario de Aguas de la Confederación Hidrográfica del Duero.
    e-mail: irm@chduero.es

    Extra background information

    The fertile floodplain is used for irrigation crops, including cultivated beetroot, alfalfa, corn and fruit trees. Also cereal can be found in the lands of the Paramo and formerly the vineyard was very important, but rare actually.

    References

    Factsheet of the project. Ministry of Environment [1]

    Related Measures

    Related Pressures