Difference between revisions of "Töss"
From REFORM wiki
(Created page with "=Töss= <googlemap version="0.9" lat="" lon="" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large"> (A) , </googlemap> <Forecasterlink ...") |
|||
Line 1: | Line 1: | ||
=Töss= | =Töss= | ||
− | <googlemap version="0.9" lat="" lon="" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large"> | + | <googlemap version="0.9" lat="47.46371" lon="8.72775" zoom="13" width="100%" height="400" scale="yes" overview="yes" toc="no" controls="large"> |
− | (A) , | + | (A) 47.46371, 8.72775 |
</googlemap> | </googlemap> | ||
Revision as of 09:39, 27 May 2014
Töss
Key features of the case study
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Establish environmental flows / naturalise flow regimes
- Facilitate downstream migration
- Remove barrier
- Widen water courses
- Allow/increase lateral channel migration or river mobility
- Remeander water courses
- Initiate natural channel dynamics to promote natural regeneration
- Remove sediments
- Remove bank fixation
- Remove or modify in-channel hydraulic structures
- Lower river banks or floodplains to enlarge inundation and flooding
- Remove hard engineering structures that impede lateral connectivity
- Construct semi-natural/articificial wetlands or aquatic habitats
- Set back embankments, levees or dikes