Difference between revisions of "Anzur. Intervención de mejora ambiental de un tramo del Río Anzur, en la Aldea del Nacimiento, en el Término Municipal de Rute (Córdoba)."
From REFORM wiki
(New page: =Anzur. Intervención de mejora ambiental de un tramo del Río Anzur, en la Aldea del Nacimiento, en el Término Municipal de Rute (Córdoba).= <googlemap version="0.9" lat="37.398275" lo...) |
m (→Key features of the case study) |
||
Line 7: | Line 7: | ||
==Key features of the case study== | ==Key features of the case study== | ||
− | + | ||
+ | This reach of the Anzur river at Aldea de Nacimiento (Rute municipality)experimented flooding and incision problems . The riparian vegetation was altered by the presence of exotic species (''Arundo donax'') or the absence of coverage by native species. Other problems related to the urbanization was the presence of debris and waste at the channel.<br /> | ||
+ | The project aimed to reduce the floods by increasing the width of the channel and its hydraulic capacity. Along with this intervention, there were other actions, based on bioengineering techniques or materials that allow their environmental integration, with the objective of improve the environmental condition of the reach and the landscape. | ||
==Site description== | ==Site description== |
Revision as of 17:30, 19 May 2010
Anzur. Intervención de mejora ambiental de un tramo del Río Anzur, en la Aldea del Nacimiento, en el Término Municipal de Rute (Córdoba).
Key features of the case study
This reach of the Anzur river at Aldea de Nacimiento (Rute municipality)experimented flooding and incision problems . The riparian vegetation was altered by the presence of exotic species (Arundo donax) or the absence of coverage by native species. Other problems related to the urbanization was the presence of debris and waste at the channel.
The project aimed to reduce the floods by increasing the width of the channel and its hydraulic capacity. Along with this intervention, there were other actions, based on bioengineering techniques or materials that allow their environmental integration, with the objective of improve the environmental condition of the reach and the landscape.
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- No measures have been assigned to this project.
Related Pressures
- No related pressures were found.