Difference between revisions of "Anzur. Intervención de mejora ambiental de un tramo del Río Anzur, en la Aldea del Nacimiento, en el Término Municipal de Rute (Córdoba)."
m (→Measures selection) |
m (→Measures selection) |
||
Line 23: | Line 23: | ||
[[Image:anzur1.jpg|left|thumb|300px|Overflow and inundation, before the project. Source: Mediodes S. L.]] | [[Image:anzur1.jpg|left|thumb|300px|Overflow and inundation, before the project. Source: Mediodes S. L.]] | ||
− | [[Image:anzur2.jpg|center|thumb|300px|During the works]] [[Image:anzur3.jpg|left|thumb|300px|Incision of the channel, before the actions]] | + | [[Image:anzur2.jpg|center|thumb|300px|During the works. Source: Mediodes S. L.]] [[Image:anzur3.jpg|left|thumb|300px|Incision of the channel, before the actions.Source: Mediodes S. L.]] |
− | [[Image:anzur4.jpg|center|thumb|300px| | + | [[Image:anzur4.jpg|center|thumb|300px|After the actions, the banks are starting to revegetate. Sediments were placed at the riverbed to improve the structure. Source: Mediodes S. L.]]<br /> |
==Success criteria== | ==Success criteria== |
Revision as of 11:40, 20 May 2010
Anzur. Intervención de mejora ambiental de un tramo del Río Anzur, en la Aldea del Nacimiento, en el Término Municipal de Rute (Córdoba).
Key features of the case study
This reach of the Anzur river at Aldea de Nacimiento (Rute municipality)experimented flooding and incision problems . The riparian vegetation was altered by the presence of exotic species (Arundo donax) or the absence of coverage by native species. Other problems related to the urbanization was the presence of debris and waste at the channel.
The project aimed to reduce the floods by increasing the width of the channel and its hydraulic capacity. Along with this intervention, there were other actions, based on bioengineering techniques or materials that allow their environmental integration, with the objective of improve the environmental condition of the reach and the landscape.
Site description
Measures selection
The works combined techniques of bioengineering, hard-engineering, and plantations:
- Silvicultural treatments. Selective clearing of brambles (Rubus sp.) and reed (Arundo donax).
- Improvement of channel morphology (regrading streambanks to a stable slope, widening the channel).
- Bank stabilization with coconut fiber - polypropylene geogrid and cylindrical rows of gabions buried 1 m from the base. Seeds of native species are placed at the grid for facilitate bank revegetation.
- Protection and correction of incision problems with cylindrical gabions.
- Revegetation of the riparian zone with plantations of poplar (Populus alba), elm (Ulmus minor), fig (Ficus carica), oleander (Nerium oleander) and tamarisk (Tamarix sp.).
- Prevent and reduce bank erosion with live stakes of oleander and tamarisk.
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Project report.Intervención de mejora ambiental de un tramo del Río Anzur, en la Aldea del Nacimiento, en el Término Municipal de Rute (Córdoba).Media:río_anzur.pdf
Related Measures
- No measures have been assigned to this project.
Related Pressures
- No related pressures were found.