All public logs
Combined display of all available logs of REFORM wiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 13:15, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1560 of page Artificial barriers downstream from the site patrolled
- 13:15, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1559 of page Artificial barriers upstream from the site patrolled
- 13:14, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1558 of page Sediment discharge from dredging patrolled
- 13:14, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1557 of page Reservoir flushing patrolled
- 13:13, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1556 of page Hydropeaking patrolled
- 13:13, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1555 of page Hydrological regime modification patrolled
- 13:13, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1554 of page Interbasin flow transfers patrolled
- 13:12, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1553 of page Discharge diversions and returns patrolled
- 13:11, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1552 of page Groundwater abstractions patrolled
- 13:03, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1551 of page Surface water abstraction patrolled
- 12:58, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1550 of page Construct semi-natural/articificial wetlands or aquatic habitats patrolled
- 12:57, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1549 of page Lower river banks or floodplains to enlarge inundation and flooding patrolled
- 12:57, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1548 of page Set back embankments, levees or dikes patrolled
- 12:56, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1547 of page Improve backwaters patrolled
- 12:56, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1546 of page Retain floodwater patrolled
- 12:55, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1545 of page Restore wetlands patrolled
- 12:55, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1544 of page Reconnect backwaters and wetlands patrolled
- 12:54, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1543 of page Develop riparian forest patrolled
- 12:54, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1542 of page Adjust land use to reduce nutrient, sediment input or shore erosion patrolled
- 12:54, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1541 of page Remove non-native substratum patrolled
- 12:53, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1540 of page Remove bank fixation patrolled
- 12:52, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1539 of page Revegetate riparian zones patrolled
- 12:52, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1538 of page Adjust land use to develop riparian vegetation patrolled
- 12:51, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1537 of page Remove hard engineering structures that impede lateral connectivity patrolled
- 12:51, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1536 of page Reconnect backwaters and wetlands patrolled
- 12:50, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1535 of page Set back embankments, levees or dikes patrolled
- 12:50, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1534 of page Lower river banks or floodplains to enlarge inundation and flooding patrolled
- 12:49, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1533 of page Reduce impact of dredging patrolled
- 12:49, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1532 of page Remove or modify in-channel hydraulic structures patrolled
- 12:48, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1531 of page Recreate gravel bar and riffles patrolled
- 12:48, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1530 of page Remove bank fixation patrolled
- 12:47, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1529 of page Add sediments patrolled
- 12:47, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1528 of page Introduce large wood patrolled
- 12:46, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1527 of page Modify aquatic vegetation maintenance patrolled
- 12:45, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1526 of page Remove sediments patrolled
- 12:44, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1525 of page Initiate natural channel dynamics to promote natural regeneration patrolled
- 12:43, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1524 of page Create low flow channels in over-sized channels patrolled
- 12:43, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1523 of page Narrow water courses patrolled
- 12:42, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1522 of page Allow/increase lateral channel migration or river mobility patrolled
- 12:41, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1521 of page Shallow water courses patrolled
- 12:40, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1520 of page Widen water courses patrolled
- 12:40, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1519 of page Remeander water courses patrolled
- 12:39, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1518 of page Fish-friendly turbines and pumping stations patrolled
- 12:39, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1517 of page Manage sluice and weir operation for fish migration patrolled
- 12:38, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1516 of page Modify culverts, syphons, piped streams patrolled
- 12:37, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1515 of page Facilitate downstream migration patrolled
- 12:35, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1514 of page Install fish pass/bypass/side channel for upstream migration patrolled
- 12:34, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1513 of page Remove barrier patrolled
- 12:33, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1512 of page Manage aquatic vegetation patrolled
- 12:33, 15 February 2010 Admin (Talk | contribs) automatically marked revision 1511 of page Link flood reduction with ecological restoration patrolled