Bouxweerd - Artificial pool
From REFORM wiki
Revision as of 15:16, 10 May 2010 by Sven Teurlincx (Talk | contribs)
Bouxweerd - Artificial pool
Key features of the case study
Site description
Measures selection
Success criteria
Ecological response
Hydromorphological response
Monitoring before and after implementation of the project
Socio-economic aspects
Contact person within the organization
Extra background information
References
Related Measures
- Lower river banks or floodplains to enlarge inundation and flooding
- Reduce groundwater extraction
- Remove or modify in-channel hydraulic structures
- Set back embankments, levees or dikes
- Restore wetlands