Recreate gravel bar and riffles
Contents
- 1 Recreate gravel bar and riffles
- 1.1 General description
- 1.2 Applicability
- 1.3 Expected effect of measure on (including literature citations):
- 1.4 Temporal and spatial response
- 1.5 Pressures that can be addressed by this measure
- 1.6 Cost-efficiency
- 1.7 Case studies where this measure has been applied
- 1.8 Useful references
- 1.9 Other relevant information
Recreate gravel bar and riffles
Recreate gravel bar and riffles06. In-channel structure and substrate improvement
General description
In few words: Install structures to encourage sediment accretion and localized diversity in channel bedforms.
Gravel bar recreation
Natural erosion and sedimentation processes in stream bed and margins originate the creation of lateral bars with alluvial materials. The bar recreation consists in simulate these natural structures which are developed in streams with medium or strong solid sediment transport. Normally the migration of coarse sediment takes place with the characteristic form of alternate bars. These structures promote lateral erosion and initiate the development of sinuosity or meandering.
Depending on the geodynamic characteristics and the solid contributions of the stream the principles for applying this technique will vary.
- • Medium to strong solid transportation. In this case simply by creating structures blocking the transit of the alluvial materials will be possible to initiate the process of side bars formation.
- • Low solid sediment transportation. When the sediment load of the stream is too low, it will be necessary to create artificial structures, similar to the natural alternating lateral bars. It is also important to adapt the structures to resist the flow (even with the use of geotextiles, biodegradable coconut if the berms are vegetated, etc).
Pool-riffle installation: In-channel gravel augmentation can be employed to create pool-riffle series or to modify pre-existing ones. This increases hydraulic and morphological diversity, enhancing river habitat.
Slope creation at regulated rivers for pool-riffle enhancement
Riffle-pool sequences are the dominant bedforms in gravel and mixed bedded channels of intermediate slope. A single riffle cannot be rehabilitated without considering the impact on upstream riffles. When we add gravel at one degraded riffle, the water rises upstream and may flood the next upstream riffle, which can lose its functionality. The backwater effect has to be considered in the design and development of the project, regarding to the maximum high of the gravel bed placed on the glide. One technique to prevent the undesired effects is the staged slope creation. Elkins et al. (2007) in a study at the River Waveney applied gravel augmentation to restore riffle-pool dynamics for habitat enhancement below a dam, so no riffle was affected upstream. The method is indicated for regulated rivers, where longitudinal slope has declined, depth is increased, velocity decreased and substrates become clogged. Always is preferable to reinstate the natural flow regime (see measures to improve flow dynamics: Establish environmental flows / naturalize flow regimes), but this measure is sometimes infeasible.
If the purpose is the recreation of riffles in the middle of a reach, for the maintenance of the riffle-pool sequence the variability of channel width plays an important role. To concentrate the flow through the pools and allow it to dissipate out across a riffle, the width can be constrained upstream of pools (e.g. with wing deflectors) and expanded upstream of riffles.
Applicability
Expected effect of measure on (including literature citations):
- HYMO (general and specified per HYMO element)
- physico � chemical parameters
- Biota (general and specified per Biological quality elements)
Temporal and spatial response
Pressures that can be addressed by this measure
Cost-efficiency
Case studies where this measure has been applied
- Westlicher Abzugsgraben
- Fish ramp Friedrichsgüte
- Fish ramp Baumannsbrücke
- Lahn Cölbe
- Klein Wall
- Maxsee
- Vääräjoki - Niskakoski
- Kuivajoki - Hirvaskoski
- Emån - Emsfors
- Meander fish ramp Erpe BB
- Fish ramp Erpe BB
- Fish ramp Erpe Berlin
- Klebach - Side channel
- Rijkelse Bemden - River bed widening
- Thur
- River Ravensbourne at Cornmill Gardens
- Blenheim Palace Project
- River Wensum Rehabilitation Project - Bintree
- Segre - Improvement of aquatic habitat of Segre River at Alòs de Balaguer
- Drava - Kleblach
- Enns - Aich
- Stora
- Conservation of Atlantic Salmon in Scotland (LIFE 04/NAT/GB/000250)
- Northern Sweden - From source to sea, restoring river Moälven (LIFE05 NAT/S/000109)
- Hampshire Avon - Hale
- Hampshire Avon - Seven Hatches
- Lower Traun
- Ruhr Binnerfeld